10710 Sharmon​

Function

Industrial

Location

Houston, Texas

Size

320,000 Square Feet​

Site

32 Acres

The Sharmon Project initially started as two spec buildings constructed without tenants, but about four months into construction, leases were secured for the spaces. The project began on-site in June 2022 with a nine-month timeline, but work was put on hold in December of that year due to required tenant improvements. During the hiatus, the project underwent significant design changes to accommodate tenant needs, involving collaboration with the Architect, Structural Engineer, and Civil Engineer. Construction resumed in March 2023 and was completed in May 2024.

Key architectural features included accent wing walls extending diagonally from the building, large storefront panels that extend over the top of the buildings, and an out-of-plane panel designed to shield the PEMB gutter above the entry. These features required monolithic construction and innovative engineering solutions to meet the architect’s complex design specifications. The Sharmon Project won a TCA Tilt-Up Award for effectively adapting to tenant needs and demonstrating strong coordination between design and construction teams.